The dam is monitored using:
-
7 normal plumb lines (a weighted wire suspended in the topmost gallery and held taut at the bottom of the shaft by a 150 kg weight) with 26 points for taking readings, so that upstream-downstream and left bank-right bank displacement can be measured*
-
3
inverted plumb lines used to check for displacements in the foundation of the dam
-
3 rockmeters to measure settlement or heave in the foundation of the dam
-
16 manometers for pressure tapping with measurement of infiltration rates
-
3
uplift measurement devices situated upstream of the drainage gallery
-
3 level meters placed at the bottom of the structure and in the bottom gallery to measure water infiltration*
-
8 piezometer tubes to gauge the water pressure or head
-
1 geodesic measurement network
*these measurements are transmitted to the operations centre at Sion |